3 ms·
hence why the work requiring the stopping and redirecting happens at night.
by bobthepanda 3y ago
hence why the work requiring the stopping and redirecting happens at night.
- MichaelZuo 3y agoThey can only complete 100m once every 12 hours?
- bobthepanda 3y agowith minimal road disruption, though. at least where I live you'll often seen lane reductions measured in weeks for repaving.
- TylerE 3y agoI've seen projects to pave only a few miles take years. Not even roads that are that busy, even.
- MichaelZuo 3y agoThat doesn't sound right, assuming a lane width of 3.5m, they can only resurface roughly 29 square meters an hours? With all that equipment and manpower.
- bobthepanda 3y agoyou need to scrape all the way to the base and then fill back in when repaving. and you also can't lay asphalt in rain.