3 ms·
Not sure if that is what you mean, but at Microsoft they have the *Bug Cap Formula, which is: Bug Cap = # engineers * 5 If the bug count exceeds the cap at th
by weinzierl 2y ago
Not sure if that is what you mean, but at Microsoft they have the *Bug Cap Formula, which is:
Bug Cap = # engineers * 5
If the bug count exceeds the cap at the end of the sprint, the next sprint is used for bug fixing only.
- iteria 2y agoI absolutely love this idea and I will be lobbying for this going forward.
- SenHeng 2y agoSeems easily gameable by simply not reporting any new bugs.
- dllthomas 2y agoMy impression is that, at a place like MS, bugs are often reported by a separate team accountable to different metrics.
- asdfman123 2y agoThat works for consumer facing bugs, but a whole lot of them are found by devs.