3 ms·
>> Aren't ground operations a lot per flight? They're aiming for a turnaround time of eventually less than a day. I'm not sure how ships are going to be caught
by phkahler 3y ago
>> Aren't ground operations a lot per flight?
They're aiming for a turnaround time of eventually less than a day. I'm not sure how ships are going to be caught and stacked, but even if ground ops took hundreds of people it's still less than a man-year effort as far as cost when it's done in a day.
- cchance 3y agoNot to mention with 2 mechazillas in both launch locations, they can technically launch 4 at a time if they want/need to.