3 ms·
> you want to use system that needs 14 launches to get to the moon to get to mars? Again, the criticisms are valid. But it's unlikely we can get to Mars--repea
by JumpCrisscross 3y ago
> you want to use system that needs 14 launches to get to the moon to get to mars?
Again, the criticisms are valid. But it's unlikely we can get to Mars--repeatedly and sustainably--without mastering in-orbit re-fuelling. So while it isn't technically necessary for a Moon mission, nor even repeated Moon missions, it is for a Moon mission that's building to Mars. (Again, repeatedly--we can do without it [1]. But it's far more expensive in the long run.)
> How long would it take to re-certify starship for a launch?
Falcon 9 has been turned around in 3 weeks [2]. The bottleneck has thus far been launch pads. If you can cut that to 2 weeks, you need 5 to 7 refuelling Starships ready per launch. Once again, the bottleneck would be launch pads.
You and I are on the same page about that re-fuelling overhead being bonkers. It's mostly because SLS and Orion suck. But if the only thing we learn from Artemis is fuel depoting, that's a huge win.
> You are going to need dozens of them launching everyday for months to prep one mission and hoping nothing will go bad
The timeline for the first propellant-transfer test is three to four weeks. 14 launches over 30 days comes to a launch every other day. Ambitious, but only about twice as frequently as the Falcon family launched in 2023, and for a shorter interval.
[1] https://en.wikipedia.org/wiki/Mars_Direct#Second_launch https://en.wikipedia.org/wiki/Mars_Direct#Second_launch
[2] https://twitter.com/SpaceX/status/1520155013661659137?ref_src=twsrc^tfw https://twitter.com/SpaceX/status/1520155013661659137?ref_sr...
- avmich 3y ago> The timeline for the first propellant-transfer test is three to four weeks. 14 launches over 30 days comes to a launch every other day. Not sure I understand your numbers here in relation to the quoted part?
- JumpCrisscross 3y ago> Not sure I understand your numbers here in relation to the quoted part The unknown variable is in-orbit propellant boil-off. How much propellant will poof away for each day in orbit, and during the propellant transfer. The test next month will observe this for 3 to 4 weeks. So for the actual mission, we will presumably have 3 to 4 weeks to put all the fuel in orbit. Assuming it takes 14 launches to launch that fuel (we won't know the final number until we do the tests), that gives us a required average launch cadence of about 2 days.
- avmich 3y agoThanks. I'd assume the boil-off should be insignificant, in a sense, or - alternatively - some active cooling systems can be used, they don't need to be big or complex.
- JumpCrisscross 3y ago> I'd assume the boil-off should be insignificant It should be, but we haven't done it yet [1]. > active cooling systems can be used, they don't need to be big or complex Cooling in space is always complicated given the only way to dump heat is radiating (or dumping into ejected mass, i.e. boil off). [1] https://en.wikipedia.org/wiki/Orbital_propellant_depot#Heavy_lift_versus_depot-centric_architectures https://en.wikipedia.org/wiki/Orbital_propellant_depot#Heavy...
- avmich 3y ago> It should be, but we haven't done it yet [1]. Yes, but there were some calculations for this - http://astronautix.com/n/n1blocksr.html http://astronautix.com/n/n1blocksr.html - which hints on boiling off to be manageable for large stages.
- withinboredom 3y agoYou’ve got to put that heat somewhere… and space being a vacuum means there’s no where to put it.
- avmich 3y agoSpace radiators, I believe, are still having some space to evolve, particularly liquid droplet radiators.
- withinboredom 3y agoAnd, where, pray, does that liquid come from ... in space? It also seems like a terrible idea to leave little ice particles flying around at hundreds of km/h...