5 ms·
If it was 1 story house of that size less than week to get it framed from a decent crew. The pictured house here was a single story house. Also this 3d print fo
by anfilt 2y ago
If it was 1 story house of that size less than week to get it framed from a decent crew. The pictured house here was a single story house. Also this 3d print for multi-story building would probably not be much faster since unless both the first and second floor shared the same interior wall layout they would have to stop and make a floor for the interior of the second floor. Plus the weight of concrete means those second floor interior walls would be conventional framed anyways. Unless you want to make the floor extremely expensive to carry that kind of load...