3 ms·
Building the walls of a concrete block house doesn't take much over 18 hours of labour either. You can't go up more than ~6 feet in a day because you need the
by londons_explore 3y ago
Building the walls of a concrete block house doesn't take much over 18 hours of labour either. You can't go up more than ~6 feet in a day because you need the bottom layers to gain strength before adding more on top, so you end up doing ~3 6 hour days.
This could be optimized further with things like block feeders/lifts to bring the blocks to the worker.
- anfilt 3y agoYea honestly this is very similar to a building built from CMU and not adding siding or interior furring strips for drywall on a CMU build. Honestly, walls are one the faster things in building anyways. It's all the other finishing work where all the time is spent.