3 ms·
I don't know, but if it was me paying the bill I would care a lot about this: https://twitter.com/anduriltech/status/1780987267630395454 https://twitter.com/an
by Culonavirus 2y ago
I don't know, but if it was me paying the bill I would care a lot about this:
https://twitter.com/anduriltech/status/1780987267630395454 https://twitter.com/anduriltech/status/1780987267630395454 "the prototype was delivered ahead of schedule, and on budget"
and statements like this:
https://twitter.com/anduriltech/status/1783241461976256553 https://twitter.com/anduriltech/status/1783241461976256553 "We look forward to delivering CCAs on schedule, within budget, and at scale."
And the scale part is important. The whole point of these CCA fleets is to have A LOT of them and for that they have to be relatively cheap to build and easy enough to produce in decent numbers. The quality of an individual CCA doesn't matter that much.