> It’s possible some tiny and insignificant changes like moving a receptacle or data opening a couple inches aren’t properly documented on the as-builts, but ma
by DiggyJohnson 3y ago
> It’s possible some tiny and insignificant changes like moving a receptacle or data opening a couple inches aren’t properly documented on the as-builts, but major changes almost always are.
Based on these responses I should have been more clear. These small and inconsequential things are what I'm referring to. Yes, the projects I'm familiar with track the medium and big stuff, and most of the small stuff.
- abduhl 3y agoI have seen multiple thousands of dollars of precast concrete get junked because an edge was less than half an inch out of tolerance. Multiple times. I have myself rejected multiple thousands of dollars of rebar because the hook length was short by less than an inch. Nothing that is shown in the plans or specs is inconsequential and payment doesn’t occur absent an approved variance.
- DiggyJohnson 3y agoAll I’m saying is that out of spec work does happen. I’m not defending it.
- abduhl 2y agoand all I'm saying is that it doesn't make it on to the job in the first place usually and it certainly doesn't make it out to the public like with the cybertruck pedal