3 ms·
They did that to our former HQ and converted it to flats - took them longer and cost more than simply blowing it up and starting from scratch. The entire build
by tibbydudeza 3y ago
They did that to our former HQ and converted it to flats - took them longer and cost more than simply blowing it up and starting from scratch.
The entire building was gutted down to only it's outer frame, the support structure - the concrete slab floors and outer support pillars.
I guess getting planning permission for this was easier to obtain than demolition and building from scratch in that area.