3 ms·
Normally folks only put holes through the lifted up/corrugated sections (so as to minimize the likelihood of leaking) so all the area in-between (the larger fla
by WillAdams 3y ago
Normally folks only put holes through the lifted up/corrugated sections (so as to minimize the likelihood of leaking) so all the area in-between (the larger flat sections) are where the electronics/solar arrays would go.