3 ms·
that's a pretty political spin. if i remember correctly the bridge in florida was entirely feasible but they got the pre-tensioning and assembly wrong.
by replygirl 3y ago
that's a pretty political spin. if i remember correctly the bridge in florida was entirely feasible but they got the pre-tensioning and assembly wrong.
- alricb 3y agoThe NTSB found that it was actually that the 11/12 node region was too weak as designed, an error that wasn't caught by the reviewer.