3 ms·
You're going to need a lot more than 2 meters... It's probably AOC (Active-Optical Fiber Cable), they're pricey even for 40Gbit, at DC lengths.
by metadat 3y ago
You're going to need a lot more than 2 meters... It's probably AOC (Active-Optical Fiber Cable), they're pricey even for 40Gbit, at DC lengths.
- pezezin 3y ago2 meters is enough to connect a server to a leaf ToR switch. Now, connecting the leaf switches to the spine is a different story...