2 ms·
I suppose it depends on who the measure is for. If it's for engineers: In 2024 a single metric is going to be far too simplistic to realistically drive any dec
by xw390111 3y ago
I suppose it depends on who the measure is for.
If it's for engineers: In 2024 a single metric is going to be far too simplistic to realistically drive any decision.
If it's for the general public: Any metric will do, might as well stick with nm.