3 ms·
It’s their job to take these things into account. This is a brand new, low volume product. The supply chain isn’t yet heavily optimized and there are a lot of t
by Aurornis 3y ago
It’s their job to take these things into account. This is a brand new, low volume product. The supply chain isn’t yet heavily optimized and there are a lot of tooling and NRE costs to make up.
Even if the BOM was $1K, that’s right in line with the standard 3-4X retail price multiplier expected for hardware products.