4 ms·
Even worse, this (the Musk one) is a 4m wide tunnel, apparently single bore. Tideway is 7.2m, single bore. The channel tunnel, which took 6 years for 50km, is 7
by rsynnott 3y ago
Even worse, this (the Musk one) is a 4m wide tunnel, apparently single bore. Tideway is 7.2m, single bore. The channel tunnel, which took 6 years for 50km, is 7.6m, two bore.
- defrost 3y agoAdding insult to injury, while the Tideway project was ongoing the UK London area underground rail system was also being upgraded with new stations and track section requiring more TBM work of the same or perhaps greater order. So the total London area TBM work during the past decade is pretty substantial and makes the work by Musk's company during that period pale in comparison.
- ianburrell 3y agoI find it interesting how Boring Co talks about how they are faster and cheaper than subway tunnels because they are digging 12ft ones. Except that the London Underground deep tube tunnels are close to 12ft diameter. Those are cramped and nothing anyone would build today, but they work. They could totally fit some little automated trains or people movers to make a usuable transit system. Instead of using cars with drivers like they do now, or coming up with a self-driving system.