3 ms·
If it's new construction or this stuff you're gonna be pulling wire either way, so the substantive difference here is there's no need to wade through the thicke
by forgetfreeman 3y ago
If it's new construction or this stuff you're gonna be pulling wire either way, so the substantive difference here is there's no need to wade through the thicket of permitting and legal battles involved with getting a new right-of-way. So yeah, by comparison this is a hell of a lot easier than getting new lines built.