2 ms·
> Nuclear only has a 90% uptime, whereas the goal for power delivery is 99.99%. Nuclear in the US has a more than 90% uptime, and the downtime is scheduled mai
by AnthonyMouse 3y ago
> Nuclear only has a 90% uptime, whereas the goal for power delivery is 99.99%.
Nuclear in the US has a more than 90% uptime, and the downtime is scheduled maintenance, which is done at times chosen specifically because the load on the grid is known to be lower then, rather than being chosen by nature at random.