3 ms·
I think scope, budget and time is a triangle. You have to choose 2 of it, and 1 is always lost. There's almost never a on-budget, on-time and on-scope project.
by chrisandchris 3y ago
I think scope, budget and time is a triangle. You have to choose 2 of it, and 1 is always lost. There's almost never a on-budget, on-time and on-scope project.