Wikipedia writes: "As of early September 2022, 32 of France's 56 nuclear reactors were shut down due to maintenance or technical problems" and "In 2022, Europe'
by TomK32 3y ago
Wikipedia writes: "As of early September 2022, 32 of France's 56 nuclear reactors were shut down due to maintenance or technical problems" and "In 2022, Europe's driest summer in 500 years had serious consequences for power plant cooling systems, as the drought reduced the amount of river water available for cooling."
- looofooo0 3y agoWhat has this to do with building? Summer gets you cheap PV battery electric energy anyhow. Lack of cooling towers etc. gives you trouble....
- hef19898 3y agoFrench reactors suffered a lack of suffciently cool water, what little water they had was too hot. Cooling towers numbers actually are sufficient.
- lucioperca 3y agoThere is still plenty of water, the problem is that you have to limit heating the river. With a cooling tower can cool with or without evaporating water depending on the design but always without heating the river. But it is cheaper to directly dump the heat into the water.
- hef19898 3y agoAnd you cannot empty the river neither, especially during a drought, can you?
- actionfromafar 3y agoMy hunch is evaporative cooling uses not very much water. You could also fill a small dam when the water flow is higher. All means higher cost, of course.
- hef19898 3y agoIt generally helps to no use hunches when it comes to hard technical questions.
- actionfromafar 3y agoOk, the hard technical answer is that a phase change from liquid to gas eats a lot more energy than just heating the liquid however many degrees. :-) My back of the envelope calculations say it's about 10 times less water to evaporate.
- hef19898 3y agoThere are detailed diagrams and formulas to calculate that. Engineering, not back of the envelope highschool physics. But guess what, people designing an building power plants know this. And whatever is built is the best compromise possible at the time. Backnof envelope calculus in 2023 or not.
- lucioperca 3y agoDry cooling tower exists but they are more expensive. Natural cooling with the evaporation eventually runs into the problem due to built-up of salts which forces you to replace non-evaporated cooling water with fresh river water and lets you dump the heated water into the river (which is limiting factor due to environmental concerns). The less water is flowing and the higher the temperature of the river are the sooner this point is reached
- roenxi 3y agoRelated and interesting thing - China appears to be building a trial reactor in the Gobi desert [0] because they think they have air cooling sorted out. Or at least close enough. I haven't checked if it is technically in the desert. [0] https://en.wikipedia.org/wiki/TMSR-LF1 https://en.wikipedia.org/wiki/TMSR-LF1
- DennisL123 3y agoEven after the summer heat the reactor availability in France had trouble inching above 2/3 for a number of reasons. One of them being age of the installations and related unplanned outages.
- Nodraak 3y ago> "As of early September 2022, 32 of France's 56 nuclear reactors were shut down" This is cherry picking. Look at the 10 years, or even lifetime, average availability. It's 90 or 95%. The reason for this bad number is because of delayed maintenance due to COVID. > "serious consequences for power plant cooling systems, as the drought reduced the amount of river water available for cooling." The reduction of power output of French nuclear was something like 0.30%. You read that right. So I would call "serious consequences" a blatant lie.
- Reason077 3y ago> "Look at the 10 years, or even lifetime, average availability. It's 90 or 95%." Average load factor for nuclear reactors globally hovers around 80% according to IAEA data [1]. In France the average is actually lower than this due to load following: by design, many French reactors don't always operate at full capacity because there isn't enough demand at off-peak times. Few, if any, reactors reach 95%: planned outages for refuelling and maintenance takes up more than 5% of their time. [1] https://pris.iaea.org/PRIS/WorldStatistics/WorldTrendinAverageLoadFactor.aspx https://pris.iaea.org/PRIS/WorldStatistics/WorldTrendinAvera...
- Angostura 3y agoWhat proportion of wind turbines were off-line for maintenance over a similar period?