3 ms·
The current hoist at this mine is 2.5MW, so that gives an idea of the existing connectivity. I actually wondered if it might be possible to reapply the main ho
by jcrawfordor 3y ago
The current hoist at this mine is 2.5MW, so that gives an idea of the existing connectivity.
I actually wondered if it might be possible to reapply the main hoist at a mine for this kind of application, many already have some energy recovery. But I don't think it would be practical in that many situations because these deep mines often have other "tenants" (this one has a cosmic ray observatory for example) that will want to continue use of the main hoist---and of course it is appealing to install this type of system in operational mines when there's a disused shaft.