2 ms·
I'm running a Renogy inverter/charger 2000W with a single 12V 100Ah LiFePo battery that run 3 Odroid H2's (Proxmox cluster 1), 3 Beelink's (docker swarm cluster
by earleybird 3y ago
I'm running a Renogy inverter/charger 2000W with a single 12V 100Ah LiFePo battery that run 3 Odroid H2's (Proxmox cluster 1), 3 Beelink's (docker swarm cluster) and various switches and ISP device. There is also a dual gpu desktop that pulls 400-450 watts when running folding at home. It will carry that load for 6+ hours from an 80% charge which is were I keep it for long term battery health; though I do shutdown the dual gpu if the power is out for more than a few minutes.
The Renogy will pass 'shore power' directly through and switch (purportly) in <10ms although I'm not confident enough that it is quick enough (1/2 a cycle at 60hz) so I run the standard consumer ups downstream.
I'm using a pretty stock RV circuit layout. The one thing I did do is limit the max charging amps to 20 to ensure that the charging load plus the working load stayed well in the capacity of the 110V/15A line.
I did try a Bluetti 3BA but it never worked as expected; ie it would cut out at unexpected times and firmware updates are problematic.