3 ms·
I was told by the actual engineers at Boeing it was difficulty in verifying.
by WalterBright 3y ago
I was told by the actual engineers at Boeing it was difficulty in verifying.
- nothercastle 3y agoVerification of inclusion and heat affected zones is indeed extremely difficult. It’s a very skill sensitive process that’s hard to get right 100% of the time