3 ms·
Competent designers and engineers consider the risks of incorrect assembly, and depending on risk assessment (probability vs severity of failure), and cost-bene
by icegreentea2 3y ago
Competent designers and engineers consider the risks of incorrect assembly, and depending on risk assessment (probability vs severity of failure), and cost-benefit assessment (cost of redesign vs cost of inspection), and based on that decide on if further mitigations are required.
- TaylorAlexander 3y agoSure that makes sense.
- uoaei 3y agoGenerally if it's possible that a complete failure of process happens, designers will plan for that. Anything outside of fully automated assembly processes with interlocks and safety checks warrant that to a decent designer. You cite cost of redesign but we're talking design in the first place. What's on the table in this discussion is design, not response to failures.