Probably depends on the country. In Italy we usually employ natural gas stoves and we use natural gas furnaces for heating, so normally you get a 3kw to 6kw max
by alanfranz 3y ago
Probably depends on the country. In Italy we usually employ natural gas stoves and we use natural gas furnaces for heating, so normally you get a 3kw to 6kw max inbound power. I think you can easily get to 10kw, but above that it's quite difficult.
- leoedin 3y agoThat's interesting. I wonder if that's part of the reason why electric car uptake has been so low in Italy? Most houses here in the UK have enough capacity to run a 7kW charger alongside other household stuff. My house electricity supply must be 50 years old and 80A (about 18 kW) - so it's not even a recent thing. Do people in Italy never have electric showers? How much power do they run to a new house? From a decarbonisation point of view it's a real challenge - the only current path to low carbon living is through electrification of heating, cooking and transport.
- jaclaz 3y agoI may add that there is an additional (lesser known) issue. The "typical" contract is 3 kW, due to air conditioners becoming more common, many people upgraded to 4.5 kW (it was also possible, cannot say if it still possible now, to make a 3 kW contract with an upgrade only during three or four months in the summer). Very few people (and very large houses) have a 6 kW contract. The "fixed" part ("potenza impegnata" translatable to "committed power capacity") is a non thrifling part of the monthly (or every two month) electricity bill, so eveyone historically used the smallest possible contract (usually there is a 10% or 20% more allowed for peaks). The electrical plant needs to be made (and certified) by a licensed electrician BUT (and here is the catch) only up to 6kW the electrician can make (and certify it) without the need of a project by an authorized technician, which adds some costs. Additionally (of course it depends on the specific area) up to 6 kW it is considered "normal" and it is rare that the distributors asks for compensation (besides the increase in the bill, and an initial "fixed amount" ) whilst when you go up, it is not uncommon that you are asked a sum as a contribution for the works needed to upgrade the distribution lines. For increasing from 3 kW to 6 kW it would be around 70 € x 3= 210 € + around 50 € + VAT and then around 22 € x 3= 66 €/year (again + VAT). Stepping up from 6 to 10 (besides needing the project and re-certification) is not unlikely to cost several hundreds or a few thousands Euro. Anyway, before the issues with the power needed for re-charging, few people have the "luxury" of a parking space or garage, I would presume that this is a bigger obstacle for electric car adoption.