i dunno about tunnel... i am not a digger but I don't think digging 26 meters (highest point of canal) would require tunneling... just dredging.
by elif 3y ago
i dunno about tunnel... i am not a digger but I don't think digging 26 meters (highest point of canal) would require tunneling... just dredging.
- aidenn0 3y agoYou'd have to deal with the Chagres (assuming the current drought ends) as well. The original excavation was done mostly dry and massive by any standards: 27kt of dynamite were used. I'm also not a digger, but 26 meters of dredging over a 13km distance sounds crazy expensive. You would have to also widen the valley to prevent landslides into the canal.