4 ms·
> Tucked under a Vancouver bridge, an energy centre sits on top of the existing sewage pumping station so heat can be captured before sewage reaches the treatme
by schneems 3y ago
> Tucked under a Vancouver bridge, an energy centre sits on top of the existing sewage pumping station so heat can be captured before sewage reaches the treatment plant
Seems like if they’re doing this right before a treatment plant that they’ll be able to localize the problem and hopefully handle it effectively. Though it would be more assuring if they also talked about some of possible problems.
- hinkley 3y agoThey’re also likely picking up heat of fermentation, rather than my shower or dishwasher water.