3 ms·
The egrees fees will be bigger than your db cost.
by ddorian43 3y ago
The egrees fees will be bigger than your db cost.
- silon42 3y agoYes, maybe (some kind of diff/sync could maybe help), but this means using such a cloud is a bad IT practice.
- theanirudh 3y agoYes, the egress fees on base backups alone were higher than the cost of the DB VMs. If we replicate the WAL also, it would be way higher. In the post, the example DB was 4.3 GB, but the WAL created was 77 GB.
- sgarland 3y agoThe joys of WAL bloat [0]. UUIDv4s? [0]: https://www.2ndquadrant.com/en/blog/on-the-impact-of-full-page-writes/ https://www.2ndquadrant.com/en/blog/on-the-impact-of-full-pa...
- deleted 3y ago[deleted]