3 ms·
For stick frame houses, around 10-15% of the cost is framing. Finishes account for the bulk of the cost.
by turtlebits 3y ago
For stick frame houses, around 10-15% of the cost is framing. Finishes account for the bulk of the cost.
- flavius29663 3y agowell yeah, because everything is so bespoke: plumbing, electrical, windows, doors, drywall, trimming. I hope to see some kind of evolution of housing where these things are not installed by skilled labor somehow.