4 ms·
The article suggests the first >Boeing would have until mid-2026 to design, test and certify a permanent fix for the engine anti-ice system defect that would t
by gruez 3y ago
The article suggests the first
>Boeing would have until mid-2026 to design, test and certify a permanent fix for the engine anti-ice system defect that would then be retrofitted to all MAXs.
- deleted 3y ago[deleted]
- bombcar 3y agoThat's much more reasonable, more like whatever it's called when you can mark a system as known inoperational but still fly the plane.
- sokoloff 3y ago"Minimum equipment list" - notably, that's used to allow a certified plane to fly with some temporary reductions in operable equipment, rather than to allow a design to proceed through certification with known defects.
- brewdad 3y agoSo we let the planes fly between Southern California, Las Vegas and Phoenix and never above 15,000 feet. Or Boeing can keep the planes grounded, fix the problems, and recertify later.
- karmelapple 3y agoI'd suggest because this is a new plane model, they simply don't let it fly, so there is no need to "beat the pilots about turning the 'melt engine' feature off until we can design and build out a fix for this". Airplanes are not the latest video game: we try to avoid a bunch of downloadable software patches required for a brand-new airplane (just as I think should be the case for video games, too). Also... continuing to have a 737 rating for decades, all in the interest of saving pilot retraining hours and making it cheaper for airlines to purchase these new aircraft, is partially why we're in this problem in the first place. Boeing needs to suck it up and truly claim a new airplane is, well, new, and requires new training.