4 ms·
It’s more like: if something has a tree structure, and the project scope is not 100% finalized, then more likely then not tree operations are going to eventuall
by setr 3y ago
It’s more like: if something has a tree structure, and the project scope is not 100% finalized, then more likely then not tree operations are going to eventually be requested. The cost savings from the hack is so low versus a standard tree representation that it’s unlikely to be worth the risk this occurs
- civilized 3y agoThe cost savings is low but the risk is high? How do you figure? It sounds like both options are easy (one is just even easier) so there's not much risk if we have to switch.