They “experienced several one-time delays including redesign and reworks from the first application of 10CFR52 design certification process and insufficient eng
by JumpCrisscross 3y ago
They “experienced several one-time delays including redesign and reworks from the first application of 10CFR52 design certification process and insufficient engineering before start of the construction” [1]. If you’re building N of a kind, the N = 1 costs are almost always higher. We know these are possible with AP1000s because we can see the same cost curve in China, albeit shifted down due to lower labour costs.
[1] Executive Summary