3 ms·
“While the levelized cost of electricity (LCOE) at these capital price points will not be immediately competitive in most U.S. markets (i.e., greater than $60/M
by JumpCrisscross 3y ago
“While the levelized cost of electricity (LCOE) at these capital price points will not be immediately competitive in most U.S. markets (i.e., greater than $60/MWhre), long term decarbonization goals combined with the long lifetime of the plant (i.e., LCOE of less than $30/MWhre for 40-60 years) should motivate revisiting the AP1000 economic feasibility if decarbonization targets are taken seriously.”
Extrapolating from Georgia for Gen III+, even just for the U.S., is flawed.
https://web.mit.edu/kshirvan/www/research/ANP193%20TR%20CANES.pdf https://web.mit.edu/kshirvan/www/research/ANP193%20TR%20CANE...
- bitshiftfaced 3y agoI'm in the unfortunate position where I'm curious to learn why extrapolating from Georgia is flawed, while also not loving the idea of reading through a 30 page technical document to find out why.
- JumpCrisscross 3y agoThey “experienced several one-time delays including redesign and reworks from the first application of 10CFR52 design certification process and insufficient engineering before start of the construction” [1]. If you’re building N of a kind, the N = 1 costs are almost always higher. We know these are possible with AP1000s because we can see the same cost curve in China, albeit shifted down due to lower labour costs. [1] Executive Summary