3 ms·
“[D]esign the software to fit the maximum team cognitive load.” I see. So, RAID drives, failover servers for redundancy, and generators (or at least UPS batter
by mariodiana 3y ago
“[D]esign the software to fit the maximum team cognitive load.”
I see. So, RAID drives, failover servers for redundancy, and generators (or at least UPS batteries) for power — but push your team to their maximum load.
- guhcampos 3y agoMight be a bit of a wording thing, because I think I got it very differently than you. To me, that sounds like "you can't design for a higher cognitive load than what your team can absorb" - and not "try to optimize the cognitive load dor the maximum your team can absorb".
- slabity 3y agoIt sounds like it should have been worded like, "Minimize cognitive load to maximize team effectiveness" The original wording sounds like could go both ways, so I understand why the person you're responding to sees it that way.