3 ms·
This is the case for all public works projects. The red-tape overhead is crazy. Regulation is necessary but the bureaucratic maze that has to be negotiated is a
by UberFly 3y ago
This is the case for all public works projects. The red-tape overhead is crazy. Regulation is necessary but the bureaucratic maze that has to be negotiated is a huge problem. I worked on a public rail system and the down-time waiting for permission on everything was draining.