This is always the case when you build large one-off projects. If you continue to build reactors non-stop you'll learn how to make the process more efficient a
by lawn 3y ago
This is always the case when you build large one-off projects.
If you continue to build reactors non-stop you'll learn how to make the process more efficient and be able to make better estimates.
Surely we software developers should appreciate how hard making accurate estimates is? And this isn't a 2 week sprint we're talking about, but a gigantic engineering project.
- matthewdgreen 3y agoBut are we going to build reactors non-stop? Is there either private-sector funding for this, or government subsidies to make it happen?
- FredPret 3y agoYes, of course. Power demand increases. Technology improves. Installed capacity ages out. There will always be a need to build new plants, might as well lean into it and be proactive.
- afterburner 3y agoUnless the technology becomes obsolete. There are other ways to generate power.
- FredPret 3y ago> Technology improves
- matthewdgreen 3y agoI found this list which shows "under construction", "planned" and "proposed". It does not look like the US is planning to build a lot of reactors. https://world-nuclear.org/information-library/current-and-future-generation/plans-for-new-reactors-worldwide.aspx https://world-nuclear.org/information-library/current-and-fu...
- mpweiher 3y agoThe US is one of the 22 signatories of the COP28 pledge to triple nuclear capacity by 2050. With the failure of Germany's Energiewende, countries have drastically re-evaluated their nuclear stances. France just did an about-face and cancelled their plans to drastically reduce nuclear capacity or even get out of nuclear entirely. Instead they are now investing into a nuclear renaissance. Poland is getting into nuclear power big time, they are buying reactors from South Korea (and possibly also the US). The Finnish Green Party has recently come out to endorse nuclear power. Japan, who was also getting out of nuclear power after Fukushima has also made an about face and is now going to reactivate more plants and even build new ones. etc.
- matthewdgreen 3y agoIt’s hard to see how these non-binding pledges mean anything. France, in particular, already generates ~75% of their electricity with nuclear. They’re really going to triple that and generate 225% of their current generation? The US is going to go from a small handful of planned reactors to hundreds? Where is the money for this coming from?
- mpweiher 3y agoMost of these countries are implementing policies. France had a law to slowly phase out nuclear and switch to renewables. They've rescinded that law and instead passed legislation to build more nuclear plants, and make building those plants easier, putting into action Macron's call for a "nuclear renaissance". Also extending the life of existing plants. Japan, site of the second worst nuclear accident, had all, then most of its reactors shuttered (after political pressure). They are now reactivating more and more of them, have rescinded the policy to get out of nuclear and instead are planning to build more plants. Poland is getting into nuclear power in big way. They currently don't have any and have just approved building 24 small reactors at six sites. I think they're also in talks with the US's Westinghouse to build more. Ukraine, site of the worst accident in history, continues to operate its plants, and is talking with Rolls-Royce to convert some of their coal plants to nuclear. Rolls-Royce wants to build these reactors in a factory (economies of scale!) and ship them to sites. There are a lot of coal power plants that either already are decommissioned or soon will be. So quite the market for mass-produced reactors. The US just approved the first new kind of nuclear reactor in 50 years, a molten fluoride salt-cooled reactor. China just gave an operation license for their first molten salt reactor (completed ahead of time), and their pebble bed reactor started delivering electricity to the grid this year. etc.
- epistasis 3y agoThese were not one-off reactors, it's just that the first ones went so poorly that everything else was cancelled. There were four that were started at roughly the same time. There were many other sites getting order ready. Westinghouse used a new regulatory process that had been created specifically at the request of industry to speed the design and build of AP1000s. Despite this, Westinghouse did not deliver constructible designs, and the contractor soldiered on with on site modifications. Westinghouse screwed up so bad that they nearly bankrupted Toshiba, their owner. So we have two failed holes in the ground at Summer in South Carolina, something like a $10B monument to corruption, with utility execs going to jail for their fraudulent reports. All the other sites that were eyeing AP1000s to replace aging reactors have now backed out. The disaster was too big. What exec wants to go to jail for a nuclear reactor? What exec wants to lose their job for greenlighting what has a not-insignificant chance of bankrupting the entire utility. Nuclear is too risky, but public perception is off, it's not running reactors that have the risk, it's the financial risk to anybody who wants to build one.
- lawn 3y agoSo you're saying that instead of learning from a single project we made the same mistakes four times at once?
- epistasis 3y agoWe learned that the economics were so poor that all future projects stopped their plans. There were supposed to be advantages to building four at once, in that there would be some economy of scale. The AP1000 were also supppsed to be somewhat "modular" to avoid on site custom builds. None of this worked out as planned. If we wanted nuclear to be a part of the energy transition, we didn't need two new reactors every decade or even four, we needed something like 5-20 per year. However, the experience of building the AP1000 has soured the market. If we are going to build more nuclear, now is the time because we have the most knowledable workforce right now, but the benefit of building nuclear looks so small in comparison to the cost and the risks that it seems unlikely. Major major support from the government is needed (and it's there from DoE's Loan Programs Office, run by a huge nuclear fan), but you also need utilities who want to place orders. And that second part is hard to create.