> Germany's solution was to reactivate lots of coal You have seen the statistics? Coal use for electricity is going down? https://blog.energybrainpool.com/wp-
by lispm 3y ago
> Germany's solution was to reactivate lots of coal
You have seen the statistics? Coal use for electricity is going down?
https://blog.energybrainpool.com/wp-content/uploads/2023/09/Abbildung-1_Energy-Brainpool-Energiemarkt-Rueckblick-August-2023_oeffentliche-Nettostromerzeugung-in-Deutschland.jpg https://blog.energybrainpool.com/wp-content/uploads/2023/09/...
> Storage of nuclear fuel at interim sites is safe and unproblematic. Which is one of the reasons the purely political problem of a permanent site can be kicked down the road by spineless politicians. Technically, safe final storage is completely solved. Finland's Onkalo site just opened, Sweden is also close to completing theirs and Yucca mountain was also ready.
Incorrect. Germany is currently spending billions to clean-up experiments to store nuclear waste (-> Asse II) and the general solution of other nuclear waste in Germany is completely unclear.
> It is being dramatically expanded all over the world
So far without effect: https://world-nuclear.org/getmedia/332179b1-b865-47cc-a239-73df453f86db/nuclear-electricity-production-2023.png.aspx https://world-nuclear.org/getmedia/332179b1-b865-47cc-a239-7...
> We should be recycling this, but alas fresh Uranium fuel is so cheap that recycling is at best marginally economical at this point.
Definitely not, re-processing nuclear fuel is extremely environmentally damaging and technically challenging.
You are bringing up dead horses, which are dead since decades. Nobody will be able to build a re-processing plant in Germany in the next 50 years.
> The Chinese already finished their copy of the EPR
Still, Europe is not in China. If nuclear friendly countries like France and the UK can't build them cost and time effective, it says something for Germany.
Plus: China finished many many more coal power plants.
- mpweiher 3y ago> You have seen the statistics? Coal use for electricity is going down? Yes, I did. Did you? They first went up for 2 years. Now energy consumption dropped because we are in a recession, due at least in part to...drumroll...high energy prices. Because Germany has the 2nd highest electricity prices in the EU. After only Ireland. And of course we would expect them to drop at least a bit, because renewables do produce some electricity. Just not reliably, and so we still produce the 2nd dirtiest electricity in the EU, after only Poland, at the 2nd highest prices in the EU after Ireland. Some accomplishment! And who produces clean electricity? France. > Incorrect ... Asse. So which part of the text that I wrote was actually "incorrect"? Who cares about the politically motivated shenanigans in Germany? The world has built 2 final storage sites and a third is close to completion. Claiming this is somehow "unsolved" is simply wrong. > [Expansion] so far without effect. Well yes, obviously. The invasion of Ukraine that laid bare the vapidness of the Energiewende happened not even 2 years ago. The cutting off of Russian gas was only a little over a year ago. The political decision-making followed and has just now been announced. Are you expecting this policy change to be implemented in a few days? Seriously? > re-processing nuclear fuel is extremely environmentally damaging and technically challenging. Only in anti-nukies scare stories. There are also reactors that can burn the stuff directly. For example the Canadian CANDU reactors, and of course a variety of newer designs. > Nobody will be able to build a re-processing plant in Germany in the next 50 years. Where did I say that a re-processing plant will be built in Germany of all places?? > If nuclear friendly countries like France and the UK can't build them cost and time effective They can. And have done so. But both UK and France believed in the renewables fairy tale and both haven't built a new reactor in, what, a decade or more? And even then the production rate even in France was extremely low. Know how has been lost, the EPR is a difficult design and at the beginning of its learning curve. The only thing that would be surprising is if there were no problems. That says nothing about nuclear power in principle, because, once again, the average construction time is still just 7.5 years, consistently over the last 50 years or so, no matter how much you want to focus on just the most extreme outliers. And of course, it also doesn't make any logical sense: do you really believe that something about the universe changed in the last 50 years that somehow has made it impossible to build nuclear power plants when we used to do it just fine? That idea is so preposterous, it doesn't pass the laugh test, yet it is gospel in EE circles.
- lispm 3y ago> because renewables do produce some electricity. like >50% this year... > CANDU "Diese wurde jedoch von Indien gebrochen; das Land baute mit CANDU-Know-how und -Technologie sein Kernwaffen-Arsenal auf." Wonderful. > no matter how much you want to focus on just the most extreme outliers France is an outlier? OKAAYYYY... > do you really believe that something about the universe changed in the last 50 years that somehow has made it impossible to build nuclear power plants when we used to do it just fine? Well, the reactors developed 50 years ago were designed with completely different technology, which is no longer in use and very very different safety standards. You can see France struggling with the steel... Additionally in 2022 up to half of their fleet was down for corrosion inspections... https://www.reuters.com/article/us-edf-flamanville/edf-must-replace-flamanville-reactor-cover-by-2024-regulator-idUSKBN19J2NF/ https://www.reuters.com/article/us-edf-flamanville/edf-must-... That will be cheap...
- mpweiher 3y ago> France is an outlier? OKAAYYYY... The EPR is an outlier. Once again: the average time to construct a nuclear power plant is around 7.5 years. Now you can focus all your attention on plants that take longer than those, and you can falsely believe that those outliers are the norm. But that does not change the fact that they are not. The average was, is, and continues to be 7.5 years. The median is actually a bit lower. https://euanmearns.com/how-long-does-it-take-to-build-a-nuclear-power-plant/ https://euanmearns.com/how-long-does-it-take-to-build-a-nucl... > Additionally in 2022 up to half of their fleet was down for corrosion inspections... Planned and scheduled corrosion inspections. They have regular inspections, seems like a Good Thing™ to me, which they delayed during COVID. So they scheduled them for the summer of 2022. They always schedule them for the summer because that's when electricity demand in France is lowest. These days, in addition to demand being lowest, supply is large because summer is when all that over-provisioned PV delivers most...just when other demand is lowest. So a good time to schedule such routine maintenance and inspections. Because nuclear power can be scheduled. Unlike wind and solar. Which just happen whenever Mother Nature feels like it. Big difference.