4 ms·
I’m pretty sure that every house on the street can run their oven at the same time. 5kW is not a lot.
by adrianN 3y ago
I’m pretty sure that every house on the street can run their oven at the same time. 5kW is not a lot.
- atoav 3y agoDepends on the diversity/simultanity factor used in the planning. I am not sure if this is the same everywhere, but typically the copper in the ground is not calculated to 100% load of all attached houses and the farther you get away from the house the lower that number will get for economic reasons. But granted 5kW is not a big problem.