5 ms·
Sorry, I'm mixed up with other discussion on this post, and the article which also discusses other lines. I'd assume the project to install 4G/5G on the Elizab
by Symbiote 3y ago
Sorry, I'm mixed up with other discussion on this post, and the article which also discusses other lines.
I'd assume the project to install 4G/5G on the Elizabeth line just overran, or would have delayed opening the railway. The wording in [1] isn't completely clear, but suggests this was supposed to happen in 2022.
[1] https://www.standard.co.uk/news/london/london-tube-underground-4g-three-ee-crossrail-b973082.html https://www.standard.co.uk/news/london/london-tube-undergrou...