3 ms·
But this is Elizabeth Line. The newest additional line in London Rails opened in 2022. I expected 4G and 5g coverage from the get go. Not one and half year late
by ksec 3y ago
But this is Elizabeth Line. The newest additional line in London Rails opened in 2022. I expected 4G and 5g coverage from the get go. Not one and half year later.
It would have been much much more impressive if it was the Central line.
- Symbiote 3y agoSorry, I'm mixed up with other discussion on this post, and the article which also discusses other lines. I'd assume the project to install 4G/5G on the Elizabeth line just overran, or would have delayed opening the railway. The wording in [1] isn't completely clear, but suggests this was supposed to happen in 2022. [1] https://www.standard.co.uk/news/london/london-tube-underground-4g-three-ee-crossrail-b973082.html https://www.standard.co.uk/news/london/london-tube-undergrou...