3 ms·
in The Netherlands is absolutely is the default. My home, built in 1971, had 1 phase connected to it but the power company already buried the 2 extra copper wi
by apexalpha 3y ago
in The Netherlands is absolutely is the default.
My home, built in 1971, had 1 phase connected to it but the power company already buried the 2 extra copper wires for 3-phase hookup, requiring only a new meter for 3 phase to be installed.