4 ms·
e.g. product recalls?
by omginternets 3y ago
e.g. product recalls?
- Gud 3y agoI install high voltage switchgear on site. A common problem is all the changes that has been added during the design stage, circuits that have been removed or altered, work that has kind of mostly been done to the schemes by the overworked secondary engineer. Sometimes, the schemes have been changed after all the wiring is completed and shipped to site, making it my pain in the ass when it's time to do the commissioning. The end result is never 100% perfect, but somewhere in between "not too bad" and "good enough".