> 4 hours at a time. This is a misunderstanding on your part. A 1 GW at 31% capacity factor is producing 7.44 GWh per day having “24h” of batteries would ther
by Retric 3y ago
> 4 hours at a time.
This is a misunderstanding on your part. A 1 GW at 31% capacity factor is producing 7.44 GWh per day having “24h” of batteries would therefore be 24GWh and thus 3 days output.
“4h” * 1GW actually represents over half of daily output from a 1GW solar farm, just what you want to provide power for 1/2 the day when the sun isn’t shining. Except even better because batteries add flexibility to better follow the demand curve.
> Batteries also piss away roughly 20% of the energy you put into them
No that 80% efficiency number assumes grid>battery>grid so AC>DC>AC conversion. However PV is DC as are batteries, so doing PV>Grid involves 1 DC>AC conversion but PV > Battery > Grid also only needs a single DC > AC conversion allowing for effective round trip efficiency in the 90-95% range depending on battery chemistry etc.
Further, if you store ~50% of the output and it costs 5% of that in losses then you need 5% more solar not 50%. More importantly nuclear only has a 70-90% capacity factor not 100%. Thus roughly 2.3 - 2.9 GW of battery backed nuclear = 1GW of nuclear but solar scales much better due to flexibility.
> Realistically, nuclear is $6/MWh
Unsubsidized nuclear is nowhere close to $6/MWh today. A 1 GW reactor produces 1GW * 24h * 365 Days * 50 years * ~70-90% capacity factor. If you’re lucky that’s ~400,000 GWh over it’s lifetime at 6$/MWh that’s only 400,000 * 1,000 * 6 = 2.4 billion dollars not enough to even cover construction costs. If you were thinking 60$ / GWh that might cover construction cost + interest assuming it’s not a disaster like but not a 500 person workforce, insurance, fuel, maintenance, decommissioning, etc.
PS: 5 years is seriously unrealistic for nuclear. The US’s most recent reactor didn’t take 7 years to build it was 7 years late and that’s for an extension to an existing nuclear power plant. Even China’s nuclear power commonly taking 7+ years. Ex: Changjiang (2008 - 2015), Fangchenggang 3 (2015-2022), Fangchenggang 4 ( 2016- not finished) etc