3 ms·
The pad rebuild and deluge system install was in parallel with the other work. Give or take, it was complete by the end of July [0] [0] https://www.youtube.co
by mft_ 3y ago
The pad rebuild and deluge system install was in parallel with the other work. Give or take, it was complete by the end of July [0]
[0] https://www.youtube.com/watch?v=GOtw3ucIKng https://www.youtube.com/watch?v=GOtw3ucIKng