3 ms·
Same reason a top of the line PC tower still has crappy stamped metal frame and crappy injection molded plastic trims. The main contractor of the elevator unit
by sapling-ginger 3y ago
Same reason a top of the line PC tower still has crappy stamped metal frame and crappy injection molded plastic trims.
The main contractor of the elevator unit is a mechanical engineering company, they contract out the control unit to the lowest bidder.
- tomasGiden 3y agoNope. This was all in house. But we are talking at home lifts for the rich and lazy (and sometimes elderly). And there was quite a bit of electronics in it with processors at each floor, on the control panel and for the motor controller and so on. So the cost added up. But yeah, I agree, some more flash would have been worth it.