4 ms·
How would they regulate fluctuations in demand? Nuclear can’t do that. You need storage, or a reasonably scalable generation medium. Nuclear as a base load is m
by helloooooooo 3y ago
How would they regulate fluctuations in demand? Nuclear can’t do that. You need storage, or a reasonably scalable generation medium. Nuclear as a base load is moot
- flextheruler 3y agoDidn’t Germany just put its nuclear power plants on standby instead of shutting them down last year
- kuchenbecker 3y agoControl rods modulate the output.
- malfist 3y agoNot quickly
- flashback2199 3y agoNot great, not terrible
- fomine3 3y agoFuel cost is a somewhat minor cost for nuclear plants, so it's not much worth to do it
- robocat 3y ago> Nuclear can’t do that You are repeating a myth. Load following is used in France: https://www.oecd-nea.org/nea-news/2011/29-2/nea-news-29-2-load-following-e.pdf https://www.oecd-nea.org/nea-news/2011/29-2/nea-news-29-2-lo... It mostly isn't used in the US due to regulations. https://news.ycombinator.com/item?id=36254716 https://news.ycombinator.com/item?id=36254716 The reason load following is not generally used is because because the economics of nuclear (large fixed costs) favour base load.
- bobthepanda 3y agoIt’s mentioned that it runs the equipment harder, and France did have to shut down a large number of plants for maintenance recently: https://www.bloomberg.com/news/articles/2023-03-11/french-nuclear-revival-hits-trouble-as-new-reactor-defects-found?embedded-checkout=true https://www.bloomberg.com/news/articles/2023-03-11/french-nu...
- natmaka 3y agoLoad-following runs the equipment harder, indeed. There are safety-related limits (power modulation proportion, duration of a pause needed after each modulation, modulations frequency...) to nuclear load-following capacity, and the very combustible status is a major parameter. Pertinent document (French ahead!): https://www.sfen.org/rgn/expertise-nucleaire-francaise-suivi-charge-seduit-europe/ https://www.sfen.org/rgn/expertise-nucleaire-francaise-suivi... Quote: « un réacteur peut varier de 100 % à 20 % de puissance en une demi-heure, et remonter aussi vite après un palier d’au moins deux heures, et ce deux fois par jour » Proposed translation: "a reactor power output can vary from 100% to 20% in 30 minutes, then after 2 hours can go back to 100% at the same speed, and can cycle this way 2 times per day". This is quite a good performance when it comes to load-following (French engineers are very good at this), however it is insufficient in the real world (save any ridiculously expensive over-provision of nuclear reactor, most idling) and very weak compared to gas turbines performances. Even in nuclear-packed France (which exports electricity) fossil fuels are also burnt in order to produce electricity since nuclear's inception, for most of the load-following and peak (about 9% in 2021), and it would be much worse without hydro. https://ourworldindata.org/grapher/share-elec-by-source?country=~FRA https://ourworldindata.org/grapher/share-elec-by-source?coun... On the other hand green hydrogen (produced by intermittent renewables at over-electric-generation time) can be stored then used at insufficient-generation time.
- pydry 3y agoYou can technically use nuclear power plants as load followers in much thr same way that you can technically keep warm by setting $50 bills on fire. Load following with a nuclear plant basically means provisioning a 2GW plant and then using, say, 0.5GW of that - throwing away the rest. (since the vast majority of the cost is capex not fuel) Every kilowatt hour produced by that 2GW power plant is already 5x the cost of a kilowatt hour produced by a wind farm. If you assume it is used for load following that goes from 5x-20x depending on capacity utilization. Pumping water uphill (snowy 2, coire glas, etc) is way way WAY cheaper and the geography to do that is ridiculously common. Electrolyzing water and storing hydrogen underground is way cheaper too, and can be stored for months cheaply.