4 ms·
When the 35W bridge over the Mississippi collapsed in 2007 it took a year and change to replace it and they paid a premium to make it happen that fast. I don't
by ls612 3y ago
When the 35W bridge over the Mississippi collapsed in 2007 it took a year and change to replace it and they paid a premium to make it happen that fast. I don't recall there being any state of emergency declared in the twin cities though.
- bluGill 3y agoThat was a.more complex river bridge though. And the old design was known to not be useful. Replacing with the same design will be cheaper and faster.