3 ms·
>there’s going to be less demand from offices and industry if a significant portion of the nearby population are making emergency plans and preparations Not th
by probablypower 3y ago
>there’s going to be less demand from offices and industry if a significant portion of the nearby population are making emergency plans and preparations
Not the case in Iceland. Only 15% of the demand is non industrial, and people still use electricity regardless of what they're working on. Grindavik itself isn't large enough to be more than a rounding error.
>even without a dip in demand from that there’s usually some oversupply with electricity generators to avoid ramp up time problems during peak demand, so possibly they decided to shut down unused capacity to reduce the risk of it being damaged
No, geothermal plants generally aren't ramped, and they produce at maximum output unless there is maintenance. They may have reduced overall output to enable individual turbines to be turned off for brief periods while installing new remote control devices. That is speculation however as I'm not at work so I can't say for sure.