3 ms·
You're talking about LOC per feature or project. GP is talking about LOC averaged over the whole organization, over all features and projects. I actually think
by nerdponx 3y ago
You're talking about LOC per feature or project. GP is talking about LOC averaged over the whole organization, over all features and projects. I actually think you're both right.
- vidarh 3y agoI specifically talked about this quote from them: > if over the long term the most productive devs at a company are only shipping on the order of 100 LOC/week, progress is gonna be really slow. And that is what I took issue with. It's specifically talking specifically about the most productive devs, and about shipping code. I was not talking about per feature or per project. I was talking in general.