These are to be mass produced, and shipped to the site. So really, the first few will have cost overruns and delays, but then they should be able to re-use all
by briffle 3y ago
These are to be mass produced, and shipped to the site. So really, the first few will have cost overruns and delays, but then they should be able to re-use all the tooling, processes, transportation equipment, etc, to get the rest going.
- petre 3y agoOnly the reactor vessel which is probably one of the most expensive parts of the entire project (21%), along with the turbine (18%). Construction, engineering services, structures are probably where the bulk of cost overruns are happening. https://ifp.org/nuclear-power-plant-construction-costs/ https://ifp.org/nuclear-power-plant-construction-costs/