13 ms·
Sometimes the spec of wants to be built is just some notes on a napkin with a whole lot of ambiguity. Sometimes the "estimate" was already predetermined to mee
by not_the_fda 3y ago
Sometimes the spec of wants to be built is just some notes on a napkin with a whole lot of ambiguity.
Sometimes the "estimate" was already predetermined to meet some arbitrary marking goal.